Skip to calculator
CountryCalc

How Much Lime Does My Food Plot Need?

A half-acre food plot on loam soil at pH 5.5 needs roughly 1,500 lb of lime to reach pH 6.5 — about 38 bags of 40 lb pelletized lime ($228) or 0.8 tons of bulk ag lime ($34). That is a rule of thumb; a $15-30 soil test gives the real number.

Starting point
Area
acres
Will the lime be worked into the soil?
Lime product (from the bag or ticket)
%
%
%
Prices
$/ton
$/bag
lb

Results

Lime to apply

69 lb

per 1,000 sq ft · 1,500 lb in all (38 bags of 40 lb)

Per 1,000 sq ft
69 lb
for small plots and gardens
Total
1,500 lb
38 bags of 40 lb
Product strength
90%
effective (ECCE)
Cost
$228
bagged · bulk $34

Rule of thumb only. Without a soil test (buffer pH) the right rate can be off by half or double. A soil test costs about the price of a few bags of lime.

Rule-of-thumb lime to reach pH 6.5

Ag lime by starting pH and soil texture, pounds per acre
Starting pHSandyLoamClay loam
6.01,0001,5002,500
5.52,0003,0005,000
5.03,0005,0007,000
4.54,0007,0009,000

Liming plan

  1. Apply it in one pass and work it into the top 4-6 in. of soil.
  2. Lime 3-6 months before planting if you can; it takes 1-3 years to fully react, faster when worked in and with finer material.
  3. Spread evenly — a broadcast spreader for pellets, a spreader truck for bulk lime.
  4. Retest the soil in 2-3 years before liming again.

Dolomitic lime also adds magnesium; use it where the soil test shows low magnesium. Pelletized lime is the same material bound into pellets — it spreads easily but is not stronger per pound.

69 lb/1,000 sq ft · 38 bags

Why lime matters more than seed

Most clovers, alfalfa and brassicas need a soil pH of about 6.0-7.0. In acidic soil, fertilizer is locked up and legumes fail, which is why extension wildlife guides put soil testing and liming first.

Soil tests recommend lime as tons per acre of a reference lime. Real products differ in strength (calcium carbonate equivalent, CCE) and fineness — coarse particles react slowly. Mississippi State's effective CCE (ECCE) = CCE x [0.5 x (% passing 10 mesh - % passing 50 mesh) + % passing 50 mesh].

Product to apply = recommendation x (the report's reference ECCE / your product's ECCE). Check the report's footnotes for its reference: many labs use 100% calcium carbonate; NC State uses about 61%. One ton per acre equals about 46 lb per 1,000 sq ft. No soil test? The calculator falls back on Colorado State's rule-of-thumb table, which is a rough guide only.

Frequently asked questions

How much lime for a 1-acre food plot?

By Colorado State's rule of thumb, about 3,000 lb of ag lime to raise loam soil from pH 5.5 to 6.5, or 5,000 lb from pH 5.0. Sandy soil needs less, clay more.

How many bags of pelletized lime per acre?

At 1.5 tons per acre, about 75 bags of 40 lb. Bulk ag lime spread by truck is usually far cheaper per ton when a truck can reach the plot.

When should I lime a food plot?

As early as possible — ideally 3-6 months before planting — and work it into the soil when you prepare the seedbed.

Sources and assumptions

Rule-of-thumb rates can be off by half or double. Test the soil (many county extension offices sell kits) and follow the lab's recommendation.