A soil test calling for 2 tons of lime per acre means 2.78 tons of typical calcitic ag lime (90% CCE, 72% effective after fineness) — 13.9 tons for 5 acres, or 128 lb per 1,000 sq ft. Top-dressed, that is 2 applications of no more than 2 tons each.

Starting point
tons/ac

From your soil test report.

% ECCE

Many labs: 100% (pure CaCO3). NC State: ~61%. See the report's footnotes.

Area
acres
Will the lime be worked into the soil?
Lime product (from the bag or ticket)
%
%
%
Prices
$/ton
$/bag
lb

Results

Lime to apply

2.78 t/ac

13.9 tons for 5 acres · 128 lb per 1,000 sq ft

Per 1,000 sq ft
128 lb
for small plots and gardens
Total
13.9 tons
695 bags of 40 lb
Product strength
72%
effective (ECCE)
Cost
$625
bulk · bagged $4,170

Liming plan

  1. Split it: apply no more than about 2 tons per acre at a time (on the surface), in 2 applications 6-12 months apart.
  2. Lime 3-6 months before planting if you can; it takes 1-3 years to fully react, faster when worked in and with finer material.
  3. Spread evenly — a broadcast spreader for pellets, a spreader truck for bulk lime.
  4. Retest the soil in 2-3 years before liming again.

Dolomitic lime also adds magnesium; use it where the soil test shows low magnesium. Pelletized lime is the same material bound into pellets — it spreads easily but is not stronger per pound.

2.78 t/ac · 13.9 tons

How lime rates are converted

Soil tests recommend lime as tons per acre of a reference lime. Real products differ in strength (calcium carbonate equivalent, CCE) and fineness — coarse particles react slowly. Mississippi State's effective CCE (ECCE) = CCE x [0.5 x (% passing 10 mesh - % passing 50 mesh) + % passing 50 mesh].

Product to apply = recommendation x (the report's reference ECCE / your product's ECCE). Check the report's footnotes for its reference: many labs use 100% calcium carbonate; NC State uses about 61%. One ton per acre equals about 46 lb per 1,000 sq ft. No soil test? The calculator falls back on Colorado State's rule-of-thumb table, which is a rough guide only.

Frequently asked questions

How much lime per acre do I need?

Only a soil test with a buffer pH can tell you. As a rough rule (Colorado State), raising pH from 5.5 to 6.5 takes about 1 ton of ag lime per acre on sandy soil, 1.5 tons on silt loam and 2.5 tons on clay loam.

How much lime per 1,000 square feet?

Divide tons per acre by 43.56 and multiply by 2,000: 1 ton per acre is about 46 lb per 1,000 sq ft, and 2 tons about 92 lb.

How much lime can I apply at once?

Michigan State guidance: up to about 2 tons per acre spread on the surface of sod or pasture, and up to 4 tons when worked into the soil. Split larger amounts 6-12 months apart.

Is pelletized lime better than ag lime?

It is the same limestone ground fine and bound into pellets, so it spreads cleanly with a broadcast spreader. Pound for pound it is not much stronger; compare products on CCE and fineness, not on claims of using less.

How long does lime take to work?

Most of the change happens in the first year, with full reaction over 1-3 years. Finer lime worked into moist soil acts fastest.

Sources and assumptions

Follow your soil test lab's recommendation and retest every 2-3 years. Over-liming is hard to undo.